As far as requirements for the qualifier, the only thing that was required of us was a 40 man gate. That is done. It required some changes to the staging area to make it fit. I have plans for some obstical changes and possibally a minor layout change but that will be after the qualifier. Radical layout changes are almost impossible due to several hurdles, big ones being. Light pole placement, all the underground wiring and the fact that I really don't know where it is or how deep it is anymore due to erosion and dirt replacement. For the most part everywhere the track is now has good dirt from me hauling a bazillion loads of topsoil and mostly sand. Everywhere else is garbage dirt and lots of shale.